防腐环氧地坪工艺
防腐环氧地坪工艺
Anti corrosion epoxy floor technology
1、素地处理:依素地状况做好打磨、修补、除尘;
1. Plain ground treatment: according to the condition of plain ground, polish, repair and remove dust;
2、底涂施工:将树脂按适当比例加入促进剂和固化剂,将素地薄刮一遍,增强表面附着力;
2. Primer Construction: add accelerator and curing agent into the resin according to appropriate proportion, scrape the plain floor once to enhance the surface adhesion;
3、铺玻纤布:将玻织布放置平整,全面铺设一道;
3. Laying glass fiber cloth: place the glass fabric flat and lay one layer in an all-round way;
4、环氧砂浆:将环氧双组份加入石英砂,用镘刀将其均匀涂布多道;
4. Epoxy mortar: the two components of epoxy are added into quartz sand, which are evenly coated with a trowel;
5、环氧腻子:用环氧双组份加入适量腻子粉,用镘刀将其均匀涂布多道;
5. Epoxy putty: add proper amount of putty powder with two components of epoxy resin, and evenly coat it with a trowel;
6、面漆施工:将调配好的面漆用镘刀或滚筒均匀涂布,完工后整体地面光亮洁净,颜色均一,无空鼓;
6. Topcoat Construction: the prepared topcoat is evenly coated with trowel or roller. After completion, the whole ground is bright and clean, with uniform color and no hollowing;
7、重防腐面漆:将调配好的面漆重复几道,达到重防腐效果;
7. Heavy duty anticorrosive topcoat: repeat the prepared topcoat for several times to achieve the effect of heavy-duty anticorrosion;
8、施工完成:24小时后方可上人,72小时后方可重压。(25度为准,低温开放时间需适度延长)
8. Completion of Construction: people can be boarded after 24 hours, and heavy pressure can be carried out after 72 hours. (subject to 25 ℃, the opening time at low temperature should be appropriately extended)
9、保养
9. Maintenance